Technical Visit and Post Study Tours will be organized after the symposium respectively. Participants taking part in the technical visit will visit Yellow River Museum, the dike of Yellow River, laboratories and the exhibition of Digital Yellow River. Those who will take part in post-study tours will not only visit dam projects, but also enjoy the beautiful local scenes.
Route |
Duration |
Participation |
Cost / per person |
Techinical Visit |
30 Sept. (1 day) |
Participant |
$300 |
Accompanying person |
$200 |
Tour A |
1-3 Oct.(3 days) |
Participant |
$750 |
Accompanying person |
$600 |
Tour B |
1-3Oct.(3 days) |
Participant |
$800 |
Accompanying person |
$700 |
Technical Visit —1 day (Sept. 30, 2011 )

Yellow River Museum

Yellow River dike

Laboratories and the exhibition of Digital Yellow River
Post Study Tour A—3 days, 2 dams ( Oct. 1-3, 2011 )
Date |
Activity |
Lodge |
Oct. 1 |
· Driving To Visit Shaolin Temple In Dengfeng |
Yingbin Hotel of The Yellow River Henan in Zhengzhou |
Oct. 2 |
· Drivng to visit Xiaolangdi Project, Driving to visit Yellow River-Crossing Project of South-to-North Water Diversion Middle Route Project
· |
Yingbin Hotel of The Yellow River Henan in Zhengzhou |
Oct. 3 |
· Visit Longmen Grottoes
Visit Baima Temple |
Yingbin Hotel of The Yellow River Henan in Zhengzhou |
Oct.4 |
· Finish the Tour after Breakfast |
Zhengzhou |

Shaolin Temple

Baima(White Horse)Temple

Xiaolangdi Project
Earth Core Rockfill Dam
H=160m
Installed Capacity:1800MW

Yellow River-Crossing Project
Post Study Tour B —3 days .3 dams ( Oct. 1-3, 2011 )
Date |
Activity |
Lodge |
Oct. 1 |
· Driving to Yichang City by Bus(about 8 hours) |
Three Gorges Project Hotel in Yichang |
Oct. 2 |
AM |
· Visit Three Gorges Project |
Shuibuya Project Hotel |
PM |
· Driving to Shuibuya project in Qingjiang |
Oct. 3 |
· Vistit Shuibuya Hydropower Project
· Visit Geheyan Hydropower Project |
Qingjiang Hotel in Yichang |
Oct.4 |
· Finish the Tour after Breakfast |
Yichang |

Three Gorges Project
Concrete Gravity Dam
H=181m
Installed Capacity: 22400MW

Shuibuya Hydropower Project
CFRD
H=233m
Installed Capacity: 1840MW

Geheyan Hydropower Project
Concrete Gravity-arch dam
H=151m
Installed Capacity: 1200MW