The No.2 generating unit of Subagu Hydropower Station controlled by SINOHYDRO Bureau 7 Co., Ltd. connected to grid for power generation on January 8, 2011. So far both two generating units of the station have been put into operation. Subagu Hydropower Station is located in Zhaojue County, Liangshan Yi Autonomous Prefecture, Sichuan Province. As a runoff hydropower station, it has an 8-m-high dam and two 26MW impulse impulse turturturbines. The design water head is as large as 1,175 m, which is highest in Asia.