Alberto SCUERO ( Switzerland )
CONSTRUCTION OF ROCKFILL DAMS WITH GEOMEMBRANE FACE: BOVILLA AND SAR CHESHMEH
Amanda Garduño Gallo (México )
CONSTRUCTION OF THE CONCRET FACE, EL CAJON DAM, NAYARIT, MEXICO
Chang Huansheng ( China )
TECHNOLOGY OF SLOPE-FIXING WITH TURNED-OVER FORMWORK FOR CONSTRUCTION OF CFRD
CHEN Jianchun (China)
STUDY ON THE METHOD OF EXPEDITING RCAC CONSTRUCTION IN COLD RAINY MOUNTAINOUS AREA AND ITS APPLICATION
CHEN Xiaohua (China)
CONSTRUCTION TECHNOLOGY OF YELE ASPHALT CONCRETE CORE DAM—— DEVELOPMENT OF ASPHALT CONCRETE CORE PAVER AND ITS APPLICATION
Dariush Belashi (Iran)
BEHAVIOR OF NARMASHIR CFRD AT THE END OF CONSTRUCTION PERIOD
FENG Xinsheng (China)
STUDY ON GRAVEL DAM CONSTRUCTION TECHNOLOGY AND ITS APPLICATION IN SIPING CFRD
Gianni Porta (Italy)
CONSTRUCTING THE KÁRAHNJÚKAR FACE SLAB ÁRAHNJÚKAR HYDROELECTRIC PROJECT – ICELAND
Gong Qianliang (China)
CONSTRUCTION PRACTICE OF CFRD OF UPPER RESERVOIR OF YIXING PUMPED-STORAGE POWER PLANT
HE Yongzhong (China)
CONSTRUCTION TECHNOLOGY OF PUBUGOU GRAVELLY SOIL CORE ROCK-FILL DAM ----STUDIES ON GRAVELLY SOIL SIEVING AND DELIVERY SYSTEM
Jong-Wook, Lee (Republic of Korea)
ASSESSMENT OF THE PRIORITY ORDER ON MAINTENACE TASKS FOR MONITOIRNG DEVICES FOR EXISTING EARTH CORE ROCKFILL DAMS IN KOREA
KE Jie (China)
DEVELOPMENT OF SHRINKAGE COMPENSATING CONCRETE FOR THE DIVERSION TUNNEL OF PUBUGOU HYDROPOWER STATION
Kim, Jae Hong (Republic of Korea)
CALCULATION OF VIBRATION ESTIMATION FORMULA BY SECURE SLOPE SAFETY AT THE TIME OF GUANTITY SITE DEVELOPMENT
klaus Knoll ( Germany )
EFFECTIVE AND ECONOMICAL PRODUCTION OF HIGH QUALITY CONCRETE FOR DAMS SHOWN ON THE EXAMPLES FROM YEWA – DAM; SON -LA DAM; SESAN III AND BAN VAE MARCELO G. COSTA ( ECUADOR ) MAZAR CFRD DAM: MAIN FEATURES ON DESIGN AND ONSTRUCTION
SONG Wanshi (China)
RESEARCH ON DEFORMATION MONITORING OF THE DAM BODY OF DONG QING HYDROPOWER PROJECT USING SAND-MUDSTONE DURING CONSTRUCTION PERIOD
WANG Jianfeng (China)
CONCRETE FACE SLAB JOINT SURFACE WATERSTOP CONSTRUCTION OF BAKUN CFRD
WANG Yongwang (China)
THE CONSTRUCTION TECHNOLOGY AND QUALITY CONTROL METHOD OF MEROVE EARTH CORE ROCK FILL DAM
Weerayot Chalermnon (Lao PDR)
CONSTRUCTION OF THE NAM NGUM 2 CFRD
Yoshikazu YAMAGUCHI (Japan)
ON THE CONSTRUCTION TECHNOLOGY FOR INCREASING THE THICKNESS OF THE CORE MATERIAL LAYER FOR EMBANKMENT DAMS AND A RATIONAL QUALITY CONTROL ETHOD FOR ITS COMPACTION
ZHANG Chenglong (China)
RESEARCH AND APPLICATION OF NEW CONSTRUCTION TECHNOLOGY OF CFDR OVING-SIDEWALL AT CHAHANWUSU HYDROPOWER STATION
ZHAO Chun (China)
STUDY ON CONTROL METHOD OF COMPACTION QUALITY OF EARTH MATERIAL IN CORE WALL OF NUOZHADU ROCK-FILL DAM
ZHOU Hougui (China)
NEW CONSTRUCTION TECHNOLOGIES FOR QINGJIANG SHUIBUYA CONCRETE FACE ROCKFILL DAM
ZHU Zhixue (China)
THE CONSTRUCTION TECHNIQUES OF SHUI BUYA CONCRETE FACED ROCKFILL DAM——CONSTRUCTION COMPACTING TEST