Briefing of Xiaolangdi Project

¡¡

The Xiaolangdi Multipurpose Dam Project (hereinafter referred as XLDP£© is located in the exit of the last gorge in the middle reach of the Yellow River, about 40 km north of Luoyang City, 130 km downstream of Sanmenxia Dam, and 128 km upstream of Huayuankou in Zhengzhou City. It will be the only reservoir with a large storage capacity on the main stem of the Yellow River downstream of Sanmenxia.xldbzt.JPG (62509 bytes)

The catchment area upstream of the dam site covers 694 thousand km2, accounting for 92.3% of the Yellow River basin. The total storage capacity of the reservoir is 12.65 billion m3, including 5.1 billion m3 long-term effective storage capacity.

XLDP consists of a dam, flood discharging structures and power facilities. The earth and rockfill dam has a sloping clay core, with the crest length of 1667 m, and a maximum height of 154 m. The flood discharging structures are composed of intake towers, three orifice tunnels, three free flow tunnels, three sediment release tunnels, one service spillway and plunge pools. The power facilities include six power tunnels, one underground powerhouse (6?00 MW turbines), three tailrace tunnels and one switchyard.

The main objectives of XLDP are flood control, sediment control as well as water supply, irrigation and power generation. Upon completion of XLDP, significant comprehensive benefits will be achieved, i.e. the flood control level along the middle reach of the Yellow River will be raised from the current level of less than one in sixty years to that of one in 1000 years; the lower reach of the Yellow River, with the co-operation of Sanmenxia Reservior, will basically be relieved from danger caused by ice jam; 7.5 billion m3 of silt will be deposited in the reservoir, thus decelerating the sedimentation at the lower reach of Yellow River thereby the river bed downstream will not be raised in the following twenty years, consequently avoiding the cost otherwise for 2-3dyke raising campaigns; an additional quantity of 2 billion m3/year of water will be provided to considerably better the conditions for farmland irrigation and municipal water supply at the lower reaches of the Yellow River; the power station will generate electricity of annual average 5.1 GWh on long term basis, and will be an ideal plant in the Hennan Power Grid for peak load adjustment.

Features of Xiaolangdi Multipurpose Dam Project

Name of project

Xiaolangdi Multipurpose Dam Project

Construction location

Border of Mengjin County and Jiyuan City, Henan Province

River

Yellow River main stream

Rock at the Dam

2 and 3 iteration sandstone, siltstone and claystone

seismological intensity at dam area

7 on the Richter scale

¡¡

Features of Reservoir

Performance of adjustment

non-complete adjustment

Designed flood level(0.1%)

274m

Check flood level(0.01)

275m

Normal high water level

275m

Normal dead water level

230m

Reservoir area at normal water level

272.3km2

Back water length at normal water level

128.0km

Total capacity of the lake

12.65 billionm3

Capacity for flood control

4.05 billionm3

Capacity for sand and water adjustment

1.05 billion m3

Capacity for sediment

7.55 billion m3

inundated arable land

0.185 million mu

relocated population

0.188 million

¡¡

Discharge flow

Maximum discharge flow at normal water level

17327m3/s

Maximum discharge at designed water level

13480m3/s

Maximum discharge flow at check flood level

13990m3/s

Maximum discharge flow at normal dead water level

8048m3/s

Maximum discharge flow at unusual dead water level

6769m3/s

¡¡

Main quantities of work

Soil and rock open excavation

36.25 million m3

Rock tunnel excavation

2.8 million m3

Soil and rock fill

55.74 million m3

Concrete and concrete reinforcement

3.37 million m3

Metal structure installation

0.0326 million t

Installation of mechanical and electrical equipment

0.0309 million t

Curtain (consolidation) grouting

0.212(0.347 million m)

Backfill(joint) grouting

0.2474 million m2

¡¡

Comprehensive efficiency

(1) Flood control

Flood control capacity in the lower reach is raised from every 60 year flood to every 1000 year flood.

(2) Ice jam control

Ice jam damage can basically be avoided.

(3) Sediment reduction

Dike raising in the lower reach is reduced 2-3 times.

(4) Water supply

Increased average adjustment water quantity is 2 billion m3.

(5) Irrigation

Increased irrigation area is 40 million mu.

(6) Power generation

Yearly average power generation is 4.599 kWh/ 5.851 kWh (the first 10 years/ 10 years after).

Commencement date of the first period work

1-Sep-91

Commencement date of the main work

12-Sep-94

Completion date

31-Dec-01

Employer

Construction and Management Bureau of Xiaolangdi Multipurpose Dam Project, MWR (Yellow River Water and Hydropower Development Corporation)

Supervisor

Xiaolangdi Engineering Consulting Corporation Ltd.

Designer

Yellow River Commission reconnaissance , Planning and Design Institute

¡¡

Contractor

Lot 1 (main dam)

Yellow River Contractor sponsored by Italian Impregilo Company, China Water Resources and Hydropower Engineering Bureau No. 14 as partner

Lot 2 (Intake, Tunnel and Spillway)

Chinese-German-Italian Contractors sponsored by German Zublin Company, China Water Resources and Hydropower Engineering Bureau No. 7 and 11 as partners, Bureau Nos. 1, 3, 4, 7 and 14 as subcontractors

Lot 3 ( Power Facilities)

Xiaolangdi Joint Venture sponsored by French Dumez Company, China Water Resources and Hydropower Engineering Bureau No. 6 as partner

Local Contractor

Water Resources and Hydropower Engineering Bureaus directly under MWR, Yellow River Engineering Bureau, Shaanxi Engineering Bureau

¡¡

Features of Structures of Xiaolangdi Multipurpose Dam Project

¡¡

Dam

Type

Rockfill dam with inclined clay core

Dam crest elevation, designed maximum height

281m, 154m

Volume

51.85million m3

Crest length, width

1667m, 15m

Maximum bottom width

864.0m

Foundation seepage control

Concrete cut-off wall (thickness:1.2m, depth:80m)

¡¡

Intake Tower

Type

Deep intake in tower form

Layout

Concentration layout of towers like Chinese character "Ò»"

Dimensions of towers(width x length x height)

276.4m x (52.8-70.0)x 113.0m

¡¡

Diversion tunnels

Number

3

Section dimensions

D14.5m

Length (1#, 2#, 3#)

1120m, 1183m, 1149m

Intake invert elevation (1#, 2#, 3#)

132m, 141.5m, 141.5m

Type of plugging gate, gate hole dimensions

Sliding plain gate, 12 x 14.5m

Maximum discharge(1#, 2#, 3#)

2960m3/s, 3250m3/s, 3250m3/s

¡¡

Orifice discharge tunnel

Type

Muti-cascade energy dissipation

Number

3

Section dimensions

D14.5m

Length (1#, 2#, 3#)

1134m, 1121m, 1121m

Intake invert elevation (1#, 2#, 3#)

175m

Type of working gate

Off centered hinge joint arc gate

Gate hole dimensions (width x height)

2-4.8 x 5.4m, 2-4.8 x 4.8m, 2-4.8 x 4.8m

Maximum water head

139.80m, 130.30m, 130.30m

Maximum discharge(1#, 2#, 3#)

1727m3/s, 1549m3/s, 1549m3/s

¡¡

Sediment tunnel

Type

Post tension prestressed concrete lining pressure gate

Number

3

Section dimensions

D6.5m

Length (1#, 2#, 3#)

1105m, 1105m, 1105m

Intake invert elevation (1#, 2#, 3#)

175m

Type of working gate

Off centered hinge joint arc gate

Gate hole dimensions (width x height)

3-4.4 x 4.5m

Maximum water head

122.3m

Maximum discharge per tunnel(discharge control)

675m3/s (500m3/s)

¡¡

Free flow tunnel

Number

3

Section dimensions (width x height) 1#, 2#, 3#

10.5 x13m, 10 x 12m, 10 x 11.5m

Length

1093m, 1079m, 1077m

Intake invert elevation (1#, 2#, 3#)

195m, 209m, 225m

Type of working gate

Cylinder hinge joint arc gate

Gate hole dimensions (width x height)

8 x 10m, 8 x 9m, 8 x 9m

Maximum water head

80m, 66m, 50m

Maximum discharge

2680 m3/s, 1973m3/s, 1796m3/s

¡¡

Plunge Pool

Type

Concrete reinforcement multi-grade plunge pool

Plunge pool (length, width, depth)

165m x 356m x28m

Stilling Basin (length, width, depth)

45m x 352m x 15m

Apron (length, width, depth)

82m x 360m x 10m

¡¡

Power tunnel

Type

pressure tunnel/penstock (before curtain/ after curtain)

Number

6

Section dimensions

D7.8m

Length (1#, 2#, 3#, 4#, 5#, 6#)

423.79m, 408.01m, 386.37m, 369.41m, 340.24m, 324.27m

Intake invert elevation (1#, 2#, 3#)

1~4#-195m, 5~6#-190m

Type of emergency working gate

Fixed wheel flat gate

Gate hole dimensions (width x height)

6-5 x 9m

Diversion flow

6 x 296m3/s

¡¡

Power House

Type

Underground power house

Dimensions (length, width, height)

251.5 x 26.2 x 61.44m

Capacity

6 units, 300mw per unit

Guaranteed output

283.9/353.8mw (the first 10 years/ 10 years after)

Hours of annual use

2560/3250 hours ( the first 10 years/ 10 years after)

Maximum water head

128.92m/138.92m (the first 10 years/ 10 years after)

Minimum water head

65.79m/90.79m (the first 10 years/10 years after)

Designed water head

112m

Type of turbine

Vertical shaft combined flow turbine

Installation elevation

129m

Main transformer

6 sets, 360MVA/500KV; 2 sets, 540MVA